Pu ear plug foaming making machine

Pu ear plug foaming making machine

Model No.︰LZ-ES

Brand Name︰luzhou

Country of Origin︰China

Unit Price︰CNY ¥ 50000 / pc

Minimum Order︰1 pc

Inquire Now

Product Description


PU ear plug foaming making machine 
 
Products Application: 
This equipment is used to produce single or double color polyurethane earplugs.
 
Products Component: 
This equipment includes one polyurethane foaming machine and one automatic flow production line. The flow production line has single and double sides for choose, which depends on the production capacity. 
 
 

SPECIFICATION
 

 
 
 
 
 
low pressure foaming machine

Item No. 

LZ- ES803

type of applicable foam

Soft foam ,  High rebound sponge , e tc .

Flux of inject

7 g - 25 g /S  (Attention:the flux could be configured)

The mix proportion

100-35-65 

Process of injecting

automatic inject by PLC programmed

Dimension

Wide: 0.8 M ; High: 1.8 M ; Long: 2 M

Weight of the machine

1 ton

 
 
Production Line

aluminium mold station

25 pcs/50pcs

Aluminium mold(1:48)

25 pcs/50pcs

Mold heating way

Water/Electricity cycling

Exterior dimension

5800mm *1200mm*1200mm
 

 

Products Characters: 
1. Continuous automatic production line can increase production capacity and reduce the rejected products.
2. Mold using water heating, guaranteed the stable temperature of the mold.
3. The whole equipment adopts PLC programming, automatic to control the injection, opening and closing of the molds, the equipment head using automatic cleaning.
4. production capacity:  A.single side production line is equiped with 25pcs molds, each molds can produce 48pcs of ear plugs each time, each hour can produce around 4500pairs ear plugs;
                                    B. double side production line is equiped with 50pcs molds, each molds can produce 48pcs of ear plugs each time, each hour can produce around 9000pairs ear plugs. 
 
 
Contact: Sarah
mobile/wechat/whatsapp: 0086-13560139619
Email: sweetchan@126.com  
 

Payment Terms︰ T/T

Packing︰ plastic film or discussed

Lead Time︰ 30 to 40 days

Product Image