Model No.︰LZ-XC
Brand Name︰luzhou
Country of Origin︰China
Unit Price︰US $ 40000 / pc
Minimum Order︰1 pc
PU sole making machine shoe production line
Product Application
This equipment is used to produce polyurethane insoles, outsoles, high heels, leather shoes, casual shoes, safety shoes, travel shoes,slippers, sandals, flip flops and other all kinds of polyurethane shoes.
Product Component
This equipment includes one three components low pressure pu foam machine and one automatic banana-type production line. According to the client's production capacity, the production line has 24, 36, 60, 80,100,
120 or other mold stations for choose.
SPECIFICATION
Three-components inject machine
Item No.
LZ905
type of applicable foam
Sole,insole, walking shoe, etc.
Flux of inject
30g-100g/S (Attention:the flux could be configured)
The mix proportion
100-65;100-110
Process of injecting
Manual or automatic inject by PLC programmed for choose
Dimension
Wide:2.1M; High:2.35M; Long:3.5M
Weight of the machine
1.5ton
Pneumatic molds Production line
Pneumatic mold station
24,36,60,80,100,120 mold station for choose
Mold station
open and close automatically
Material for work station
3mm, iron plate
Mold heating way
water recycling system
Water heating box
150L,304 stainless steel
Why choose it:
1. Most of the components are imported , like the metering pump and electrical components, greatly enhancing equipment running reliability and service life;
2. The moulds can be opened and closed automatically by the pneumatic system which can save the labor cost and around 2~4 people are required for the production only.
3. The molds are heated by circulating water heating system , i t can save 3/2 electricity compared with the traditional manual machine, it also makes the temperature of the molds stabler.
4. the injection can be or can not be robotic control, which is customized for the client.
What it can produce:
Contact: Sarah
Mobile/wechat/whatsapp: 0086-13560139619
Email: sweetchan@126.com
Payment Terms︰ T/T
Packing︰ plastic film or discussed
Lead Time︰ 30 to 40 days